Client: Orange City Council
Value: $4.98 Million
Period: June 2011 – January 2012
Main Features
- 6km Arterial Road
- 138,000m3 Earthworks
- 44,000m2 Lime stabilising, underside formation
- 49,000m3 Import Selected Material
- 72,000m2 Pavement (Sub base, Base) construction
- 490 Lin m stormwater drainage
- 4.9km Sub soil drainage
- 1.9km Concrete lined channel