Client: Lend Lease
Value: $46.7 Million
Period: April 2010 – August 2012
Location: Jordan Springs, NSW
Main Features
- 375,000 cu.m of Bulk earthworks completed
- 815,000 sq.m of Topsoil respread
- 125,000 sq.m of Road pavement constructed
- 100,00 tonne of Sandstone placed
- 45,000 tonne of Road base placed
- 30,000 lin.m of Kerb constructed
- 20,000 lin.m of Stormwater drainage installed
- 500 lin.m of Culvert installation completed (inclusive of a 5 cell culvert crossing)
- 15,000 cu.m of Concrete drainage structures installed
- 40,000 sq.m of Concrete footpath constructed
- 45,000 sq.m of Turf laid
- 33,000 sq.m of Geosynthetic clay liner placed on the Main Lake floor
- 4,300 sq.m of Gabion rock mattress installed
- 850 sq.m of Concrete retaining walls constructed on the Lake perimeter
- 850 Residential Lots constructed
- Lead-in services coordinated
- Installation of Sewer, Water and Electrical services to all lots within the Village