Client: John Holland
Value: $6.55 Million
Period: April 2013 – August 2014
Location: Leppington, NSW
Main Features
- 80,000 sq.m of Road pavement constructed
- 15,000 lin.m of Kerb constructed
- 4,000 sq.m of Concrete footpath to be constructed
- 6,000 lin.m of Stormwater drainage installed
- 80 lin.m of Culvert installation completed (inclusive of a 5 cell culvert crossing)
- 350 drainage pits installed