PROJECT: Waterside Penrith November 2004
– April 2006 Cost: $15m A large site that
included the construction of extensive waterways, this included the remediation
of a large quantity of Sodic saline soils as well as a small demolition
component including asbestos. JK Williams as head contractor were also
responsible for the construction of several bridges as well as all landscaping
which was a major component of the 50Ha site.
|