North Orange Bypass

North Orange Bypass
North Orange Bypass
North Orange Bypass
North Orange Bypass
previous arrow
next arrow
ArrowArrow
Slider

Client:  Orange City Council

Value: $4.98 Million

Period: June 2011 – January 2012

Main Features

  • 6km Arterial Road
  • 138,000m3 Earthworks
  • 44,000m2 Lime stabilising, underside formation
  • 49,000m3 Import  Selected Material
  • 72,000m2 Pavement (Sub base, Base) construction
  • 490 Lin m stormwater drainage
  • 4.9km Sub soil drainage
  • 1.9km Concrete lined channel